January 27, 2015
Smokers are kindly asked to pay more attention to smoke only outside the building at a distance of minimum five meters of all building entrances or in the designated smoking areas which are the following:
Nador u. 9 (Monument Building) – 2nd floor roof terrace
Nador u. 9 (Faculty Tower) – 2nd floor Japanese Garden
Frankel Leo ut 30-34 – 4th floor roof garden
Kerepesi ut 87 - courtyard
January 27, 2015
Soft demolition works in the Nador 13 and Nador 15 buildings have commenced. Since Jan. 19, further demolition works may result in increased noise and vibration. Vehicle traffic on Nador Street will also increase. As the Nador 13 and 15 buildings are now construction sites, pedestrian traffic is directed to the other side of the street. Pedestrian traffic along the temporary construction fence is extremely dangerous and forbidden. Please pay increased attention when crossing the street.
January 27, 2015
In addition to existing PhD Labs, a new location opened on the 4th floor of the Oktober 6 utca 7 building at the end of December 2014.
January 27, 2015
The new CEU Campus Location Finder tool is now accessible from the CEU website at http://locations.ceu.hu/. The Location Finder helps members of the CEU community to find a school, department, support or administrative unit at CEU. A specific person's location and contact details are searchable via http://eguide.ceu.hu/.
January 5, 2015
The architectural firm O'Donnell + Tuomey that have led the design of CEU's campus redevelopment have won another university competition in Ireland.
http://www.architectsjournal.co.uk/news/odonnell-tuomey-triumphs-in-cork-uni-contest/8674522.article
